Bill of Quantity-revised in Aug 2009

Quotation for the Construction of Farmer’s Friend Biodigester - August 2009
SN Item Unit Unit Cost  4m3    6m3     8m3     10m3     15m3   
      USD** Qty Total Cost $ Qty Total Cost $ Qty Total Cost $ Qty Total Cost $ Qty Total Cost $
I Construction Materials                        
1 Solid Brick piece 0.045 2000 90 2400 108 2800 126 3200 144 4500 202.5
2 Cement bag 5.2 14 72.8 18 93.6 22 114.4 26 135.2 40 208
3 Gravel 1x2 m3 26 0.5 13 0.8 20.8 0.9 23.4 1.2 31.2 3 78
4 Coarse sand m3 8 0.4 3.2 0.6 4.8 0.8 6.4 1 8 2.5 20
5 Fine sand m3 10 1.1 11 1.2 12 1.3 13 1.4 14 3 30
6 Inlet PVC pipe 10cm Ø  piece 4.5 2 9 2 9 2 9 2 9 2.5 11.25
7 Iron bars ø 6 kg 1.5 8 12 10 15 12 18 13 19.5 25 37.5
8 Binding wire kg 1.3 0.5 0.65 0.5 0.65 0.5 0.65 0.5 0.65 1 1.3
9 Acrylic emulsion paint Litre 3 1 3 1.2 3.6 1.3 3.9 1.5 4.5 3 9
  Subtotal 1       214.65   267.45   314.8   366.05   597.55
II Appliances /Accessories                        
10 G.I, Gas outlet pipe Ø 2”, 0.6 m long  piece 5 1 5 1 5 1 5 1 5 1 5
11 GI nipple, Ø 0.5”  piece 0.7 1 0.7 1 0.7 1 0.7 1 0.7 1 0.7
12 Main gas valve Ø 0.5” piece 3 1 3 1 3 1 3 1 3 1 3
13 Male-female socket Ø 0.5” piece 0.7 1 0.7 1 0.7 1 0.7 1 0.7 1 0.7
14 PVC 90o elbow piece 0.12 4 0.48 4 0.48 4 0.48 4 0.48 4 0.48
15 Tee Ø 0.5” (aluminium thread inside) piece 1 3 3 3 3 3 3 3 3 3 3
16 Reduction nipple Ø 0.5”-9 mm Piece 1 2 2 2 2 2 2 2 2 2 2
17 Glue for PVC connection bottle 0.7 1 0.7 1 0.7 1 0.7 1 0.7 1 0.7
18 Water drain Valve piece 4 1 4 1 4 1 4 1 4 1 4
19 Gas tap piece 6 1 6 1 6 1 6 1 6 1 6
20 Teflon tape piece 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25
21 PVC pipe Ø 0.5 metre 1.5 10 15 10 15 10 15 10 15 10 15
22 Gas hose pipe Ø 0.5”  metre 1 1 1 1 1 1 1 1 1 1 1
23 Stoves single burner piece 12 2 24 2 24 2 24 2 24 2 24
24 Lamp piece 4 3 12 3 12 3 12 3 12 3 12
25 Pressure Gauge unit 2 1 2 1 2 1 2 1 2 1 2
  Subtotal-II       79.83   79.83   79.83   79.83   79.83
III Labours                        
26 Skilled Labour  No. 4.5 10 45 11 49.5 13 58.5 15 67.5 20 90
27 Unskilled Labour  No. 2 10 20 11 22 13 26 15 30 20 40
28 Excavation of soil cu.m 1.5 10 15 12 18 15 22.5 19 28.5 25 37.5
  Subtotal III       80   89.5   107   126   167.5
  Total       374.48   436.78   501.6   571.88   844.88
  Guarantee         10   15   20   25   35
  Participation Fee        15   15   15   15   15
  Total (Including guarantee and after sales services)        399.48   466.78   536.6   611.88   894.88
** Indicator price, actual price will vary depending on location and market developments, ±5%

 
 

 
 
Designed by: Manich